[Construction Example] Slope repair. Rich in flexibility, suppressing the initial movement of loose stones and floating rocks.
Case study using Ribmat Green R-20! Conducted in October 2019 (R1).
This is an introduction to a case where the "Tezak Super Lock (G-spec)" was installed for rockfall prevention as part of the municipal land improvement project slope repair work. The project was commissioned by the Chikuma City Hall in Nagano Prefecture and was carried out in Nagano Prefecture. The area covered was 150m², implemented as a rockfall countermeasure and prevention. This method utilizes the flexibility of wire ropes and the restraining and supporting power of anchors to suppress the initial movement of loose stones and boulders scattered on the slope. [Case Overview] ■ Project Name: Municipal Land Improvement Project Slope Repair Work ■ Location: Nagano Prefecture ■ Date of Construction: October 2019 (R1) ■ Area: 150m² ■ Purpose: Rockfall Countermeasure and Prevention *For more details, please refer to the related links or feel free to contact us.
- Company:日本植生
- Price:Other